UAB Granex
Like most new production or storage buildings, the company has a limited allowable load on the roof surface. Therefore, after evaluating the roof construction of each building, only those locations were selected and only those solutions that would ensure maximum security guarantees and maximum electricity generation. A mixed structural installation solution has been applied – in places the power plant is pressed with ballast blocks, in other places, where necessary, a special bituminous anchoring system is used. The building faces directly to the south, so the energy generated by the power plant is at its maximum.