UAB Lyra Group
This power plant was implemented in two phases in duration of over one year. The second phase of the power plant was planned on a production building that was under construction. Much attention has been paid to the orderly supply chain of power plant components. The examination of the roof revealed that the load on the roof is limited, therefore special attention had to be paid to the design and allocation of the 1,751 units for maximum electrical generation and within the permissible roof load.